- Math »
- One kg of basmati rice costs $ 43.75. find the cost of 17 1/2 kg of rice?
One kg of basmati rice costs $ 43.75. find the cost of 17 1/2 kg of rice?
One kg of basmati rice costs $ 43.75. find the cost of 17 1/2 kg of rice? The Correct answer is $765.625
by J Nandhini
Updated Feb 26, 2024
One kg of basmati rice costs $ 43.75. find the cost of 17 1/2 kg of rice?
The Correct answer is $765.625
Explanation
To find the cost of 17 1/2 kg of rice, we can multiply the cost of 1 kg by the total weight in kilograms:
Cost of 17 1/2 kg = Cost of 1 kg × 17.5
Cost of 1 kg = $43.75
Cost of 17 1/2 kg = $43.75 × 17.5
Calculating this:
Cost of 17 1/2 kg = $43.75 × 17.5 = $765.625
So, the cost of 17 1/2 kg of basmati rice is $765.625.
Multiplication
Multiplication is an operation that combines two numbers to give a result called the product. It is denoted by the "×" symbol or by placing the numbers next to each other.
For example, the multiplication of 3 and 4 can be denoted as 3 × 4 or simply 3 4, and the result is 12. Multiplication is a fundamental arithmetic operation and is used in various mathematical contexts, such as calculating areas, volumes, and rates of change.
One kg of basmati rice costs $ 43.75. find the cost of 17 1/2 kg of rice? - FAQ
1. One kg of basmati rice costs $ 43.75. find the cost of 17 1/2 kg of rice?
The Correct answer is $765.625
Recent Updates
- Two ships are sailing in the sea on the two sides of a lighthouse. The angle of elevati...
- A boatman can row 2 km against the stream in 20 minutes and return in 10 minutes. Find ...
- The numbers 33, 45 and 78, used in relation to vinyl records, refer to how much they co...
- A trader sold a cycle at a loss of 10%. If the selling price had been increased by Rs. ...
- In a garden, 2626 trees are planted at equal distances along a yard 300300 metres long,...
- A man plants 15376 apple trees in his garden and arranges them so that there are as man...
- The simple interest on a certain sum for 3 years in Rs. 225 and the compound interest o...
- p is thrice as good a workman as q and therefore able to finish a job in 48 days less t...
- If a and b together can complete a piece of work in 15 days and b alone in 20 days, in ...
- A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 d...
- Jonathan and his sister Jennifer have a combined age of 48. If Jonathan is twice as old...
- The difference between the Compound interest and the Simple interest on a certain sum a...
- 12 men can complete a piece of work in 4 days. 15 women take 8 days to complete the sam...
- If a person walks at 14 km/hr instead of 10 km/hr, He would have walked 20 km more. The...
- Rs. 1200 is lent out at 5% per annum Simple interest for 3 years. Find the amount after...