The marked price of the bulb is 60% more than its cost price. A shopkeeper offers a discount of x% on marked price of the bulb while he gets the profit of 36%. Find the value of x?
212 days agoExplore the shopkeeper's strategy: Find the discounted value of a bulb priced 60% higher than its cost price, ensuring a 36% profit.
A Truck covers a certain distance in 12 hours at the speed of 70 km/hr. What is, the average speed of a car which travels a distance of 120 km more than the truck in the same time?
212 days agoFind the average speed of a car covering a distance exceeding a truck's by 120 km, both vehicles completing their journeys in 12 hours.
How much quantity of rice of the price Rs 18 per kg should be mixed with 45 kg of rice having price Rs 26 per kg so that after selling the mixture at Rs 25.2 per kg, There is a profit of 5%?
212 days agoLearn how much Rs 18/kg rice to blend with 45 kg of Rs 26/kg rice for a 5% profit at Rs 25.2/kg retail price.
A does half as much work as B in one-sixth of the time. If together they take 10 days to complete a work. How much time shall B alone take to do it?
212 days agoExplore the intricacies of A's and B's productivity as they collaborate on a task, revealing the time it takes for B to complete the work solo.
A man takes 3 hours 45 minutes to row a boat 15 km downstream of a river and 2 hours 30 minutes to cover a distance of 5 km upstream. Find the speed of the current
212 days agoCalculate the current's speed by analyzing a man's rowing times of 3 hours 45 minutes downstream and 2 hours 30 minutes upstream over distances of 15 km and 5 km respectively.
A Carpenter travelled a distance of 61 km in 9 hrs. He travelled partly on foot at the rate of 4 km/hr and partly on bicycle at the rate of 9 km/hr. The distance travelled on foot is
212 days agoExperience the voyage of a carpenter spanning 61 km in 9 hours, mixing walking at 4 km/hr and biking at 9 km/hr. Reveal the distance trekked on foot.
Two pipes A and B can fill a cistern in 30 minutes and 40 minutes respectively. Both the pipes are opened. Find when the second pipe B must be turned of so the cistern may just be full in 10 minutes.
212 days agoEfficient cistern filling strategy: Calculate the ideal shutdown time for pipe B to achieve a complete fill within 10 minutes, alongside pipe A, operating with a 30-minute fill time.
A cylindrical tank with radius 5 m is being filled with water at a rate of 4 m^3/min. How fast is the height of the water increasing?
213 days agoExplore the relationship between water fill rate and height increase in a cylindrical tank with a 5m radius.
A can do a piece of work in 10 days and B in 15 days. How long will they take together to finish it?
213 days agoLearn the joint productivity of individuals A and B to ascertain the timeframe for completing a task together.
If a man were to sell his handcart for Rs. 720, he would loss 25%. To gain 25%, the selling price is
213 days agoLearn the strategic selling price adjustment required to recover from a 25% loss and achieve a 25% profit on a handcart sold for Rs. 720.